Construction of RCC channel including intake, Forebay ,
Pump house , with all accessories for drawal of
cooling water from Ennore Port Basin for NCTPS
stage-II (2x600 MW) on EPC basis.
Scope of Work
:
The RCC cold water channel 12 m x 8m size ,
length 845 m and capacity of 65 cumecs is constructed below the three tracks
of railway line and the 15m wide Hot water channel without disturbing the Railway
Traddic or the Hot water flow ,by the "Diversion Methodology" , ingeniously by the contractor.
a. Forebay - 122 m Length
b. Pump house with EOT crane - 67 x 27 m size
c. Intake - 35 m length
Location
:
Chennai
Value
:
90.81 cr.
Duration
:
42 months
Completion date
:
28.02.2013
Name of the
Project
:
Construction of a Passenger Berth and Allied Facilites UTL Administration
Scope of Work
:
Construction of 120 nos 1000mm dai marine bored cast in situ piles,
300 m main berth, 40 m approach bridge, 2000 m2 passenger terminal building,
11000 m2 land development work & provision of rubber dock fenders 19 nos & construction of mooring dolphin.
Location
:
Cochin Port Kerala
Value of Work
:
27.76 cr.
Duration
:
15 months
Completion Date
:
03.07.2012
Name of the
Project
:
Construction of Outfall achannel.
Tsunami protection Bund and shore Protection work for PFBR Project.
Scope of Work
:
The above work involves construction of Tsunami bund , outfall channel and shore protection works and related marine works with boulders /
rock armours as per specifications. The total executed quantity of boulders/rock armours is 2.52.607 cum.
Location
:
Chennai, Tamil Nadu
Value of Work
:
41.30 cr.
Duration
:
25 months
Completion Date
:
31.08.2009
Name of the
Project
:
Construction of Tug berth and Navigational Dolphin (ND3) of M/S Ratnagiri Gas and Power Pvt. Ltd.
Scope of Work
:
The Work involves 39 nos marine bored cast-in-situ 1300 mm dia RCC piles in varying depth of Water from 18 mtrs to 23 mtrs in sea
& boring upto 12 mtrs depth along with superstructure consisting of precast RCC members.
Location
:
Ratnagiri
Value of Work
:
47.58 cr.
Duration
:
10 months
Completion Date
:
31.05.2009
Name of the
Project
:
Marine
- Jetty
Location
:
Naval
Wharf Jetty At Port Blair, Andaman & Nicobar
Islands
Period
:
2000 -
2003
Name of the
Project
:
Marine
- Sea Wall
Location
:
Ennore Express Way, Chennai, Tamil Nadu
Period
:
2003 -
2005
Name of the
Project
:
Construction of Mus Breakwater
Location
:
Car Nicobar, A & N Islands
Period
:
2002
Name of the
Project
:
Provision of Berthing Facilities
Location
:
Coast
Guards, Port Blair
Period
:
2002
Name of the
Project
:
Bridge
for Southern Railway
Description
:
Construction of bridge for Southern Railway at Calicut including piling work and PSC girders was
recently in 2002.
Name of the
Project
:
Provision of Berthing facilities for Coast Guard
Description
:
Construction of Jetty for Coast Guard in 2002
has also been completed.