You do not have flash player installed.
Click Here
to install latest Flash Player.
Site Map
You do not have flash player installed.
Click Here
to install latest Flash Player.
Home
Airport Infrastructure
Name of the Project
:
Provision of Main Runway with Hardstanding
Scope of Work
:
Earthwork excavation,WMM,DLRC,flexible pavement ,rigid pavement , box /pipe culverts and allied items
Location
:
Air force station Thanjavur
Value of Work
:
96 Cr.
Period
:
34 month
Completion date
:
19.10.2013
Name of the Project
:
Provision of Main Runway with Hardstanding
Scope of Work
:
Earth work in excavation / forming embankment , GSB-WMM/BUSG/DLRC,BITUMINOUS WORKS , CEMENT CONCRETE WORK (PQC), PIPE CULVERT, BREAST WALL
Location
:
Air force Station Phalodi , Rajasthan .
Value of Work
:
81.05 Cr.
Period
:
41 months
Completion Date
:
31.03.2010
Name of the Project
:
Airport Terminal Buildings
Location
:
Port Blair
Period
:
2000
Name of the Project
:
Overlay Work of Airfield
Location
:
Air Force, Nalia
Period
:
1999
Name of the Project
:
Extension of Airport Runway
Location
:
Bagdogra, West Bengal
Period
:
2001
Name of the Project
:
Resurfacing of Runway
Location
:
Kalaikunda, West Bengal
Completed
:
28/02/2005
Name of the Project
:
Provision of Rigid Hardstanding
Location
:
Carnicobar
Period
:
2004 - 05
Name of the Project
:
Provision of Parellel Taxi Track
Location
:
Air Force, Carnicobar
Period
:
2004 - 05
Name of the Project
:
Resurfacing of Runway
Description
:
Resurfacing of Runway and Taxi Link at Naval Base Kochi, recently completed.
Name of the Project
:
Overlay Work of Airport
Location
:
Port Blair
Period
:
1996
Name of the Project
:
Provision of Dispersal area at 37 wing of Carnicobar
Description
:
This project is being executed for MES, Port Blair.
Back
Top
© Copyright 2008,
RDS Project Ltd.
, all rights reserved |
Employee Login
designed by:
cross section